Net Metering

Net Metering Guide Pakistan 2026

Cut your electricity bill by going solar — learn how net metering works, who qualifies, and how to apply with LESCO.

What is Net Metering?

Net metering is a billing arrangement that lets solar system owners export surplus electricity back to the national grid in exchange for credits. In Pakistan, NEPRA introduced net metering regulations in 2015, allowing consumers with 1 kW to 1 MW solar installations to offset their LESCO bills with the units they generate. At the end of each billing cycle, you only pay for the net electricity consumed — the difference between what you imported from the grid and what you exported.

How Net Metering Works

Solar Panels Generate Power

During the day, your panels produce DC electricity that an inverter converts to AC.

Your Home Uses It First

Power flows to your appliances directly — reducing the units you draw from LESCO.

Surplus Goes to the Grid

Any extra units are exported through a bi-directional meter and credited on your bill.

Benefits of Net Metering

Lower Electricity Bills

Offset your LESCO bill by exporting surplus solar units back to the grid at NEPRA-approved rates.

Clean & Renewable

Reduce your carbon footprint by generating clean electricity from rooftop solar panels.

Grid Independence

Continue using the grid as backup while producing most of your own power during the day.

Long-Term Returns

Most systems pay back in 3–5 years and continue saving for 20+ years of panel life.

Eligibility Requirements

  • Existing LESCO consumer with active 3-phase connection (recommended for >5 kW)
  • Sanctioned load between 1 kW and 1 MW
  • Roof or land available for solar panel installation
  • No outstanding electricity bill dues
  • Use of AEDB-certified equipment and licensed installer

Application Process

1

Survey & Sizing

Hire an AEDB-licensed vendor to assess your roof, load, and recommend system size (typically 5–15 kW for homes).

2

Install Solar System

Vendor installs panels, hybrid/on-grid inverter, and bi-directional energy meter compatible with net metering.

3

Apply to DISCO (LESCO)

Submit the net metering application along with required documents to your nearest LESCO Customer Service Center.

4

Technical Inspection

LESCO engineers inspect the installation and verify it meets NEPRA safety and grid-code requirements.

5

License & Agreement

Receive your generation license from NEPRA and sign the 3-year net metering agreement with LESCO.

6

Meter Installation

LESCO installs the bi-directional meter — you can now export surplus units to the grid.

Required Documents

  • Copy of CNIC of the consumer
  • Latest paid LESCO bill (last 3 months)
  • Ownership proof of the premises
  • Single Line Diagram (SLD) of the solar system
  • Equipment specifications & datasheets (panels, inverter)
  • Installation completion certificate from licensed vendor

Solar System Requirements

  • On-grid or hybrid inverter with anti-islanding protection
  • Solar panels meeting IEC 61215 / 61730 standards
  • Bi-directional energy meter (installed by LESCO)
  • System capacity must not exceed sanctioned load
  • Compliance with NEPRA grid code and safety standards

Cost vs Savings — Run the Numbers

A 5 kW rooftop solar system costs roughly Rs. 700,000–1,000,000 in 2026 and can save Rs. 25,000–40,000 per month on a typical 800-unit LESCO bill. Use our calculator to compare your current bill against projected solar savings.